It has been some time since the last post, a lot of things have happened. The fixed furniture in most of the rooms is now in place. The outside has been tarmacked and there it is not likely that any other heavy plant will be arriving. Its should start to get quieter on site.
This is the reception room that is almost finished.
And in my opinion the best feature of this room is the microwave.
Now that the snow has gone, work can continue at the school. We recently acquired a 360 camera so we can now do wide angle photos and eventually 360 photos. The picture below is of Class 5, the fixed furniture has now been installed on the left. The teaching wall is on the right.
This is a picture of the hall below, currently it is in less of a complete than the class rooms.
Within the last few weeks there have been some editions to the site. The soffit boards have just started going up as well as additions inside, such as the plumbing, hand dryers and doors in the toilets.
Over the last month the school is having the fixed furniture installed. Also the brick work on the outside is almost complete with just some pointing to go.